ALAGADI project is overlooking to Turtle Beach and 10 min driving distance to the new golf course.
Other Pluses in Alagadi
+ Communal pool and areas is standard.
+ 2 air-conditioning units
+ White Goods in the kitchen
Standard finishes included in basic build :
Damp proof course.
Construction concrete.
Fitted kitchen units with Formica work tops.
Fitted wardrobes in all bedrooms.
Minimum of 2-4 electrical sockets in every room.
Split type Air Conditioning units in Lounge and Master Bedroom.
Kitchen fitted with hob,oven, extractor fan and fridge freezer.
White aluminum double glazed windows.
Solar panels and hot water emersion tank system.
Parking area for each apartment.
Kitchen
Electrical points.
Telephone point.
Double stainless steel sink with mixer tap.
Ceramic wall tiling between base units and cupboards.
Ceiling lighting.
Hob + Oven
Extractor Fan.
Fridge Freezer.
Lounge
Hallway
Electrical points.
Telephone point.
TV point.
Ceiling and/or wall lights.
A/C unit heating and cooling.
Electrical points.
Ceiling lights.
W.C. + Shower
En-Suite
Hand basin / Shower tray / Toilet unit
Ceramic wall tiles. (h : door height)
Shower Tray / Hand Basin / Toilet
Ceramic wall tiles. (h : door height)
Bedroom 1 (Master Bedroom)
Bedroom 2
Electrical points.
Ceiling lights.
Built in fitted wardrobes.
A/C heating and cooling
Electrical points.
Ceiling lights.
Built in fitted wardrobes.
Bedroom 3
Electrical points.
Ceiling lights.
Payment Plan
Reservation Deposit: £ 1000 1st payment, on signing the contract : %25 2nd payment: %20 2nd payment is due on completion of the foundations 3rd payment: %25 3rd payment is due on completion of the concrete structure and brick works 4rt paymen: %25 4th payment is due on completion of the interior door frames, Plaster works, all electrical and water pipe works. Interior Flooring and wall tiles. Final Payment: % 5 Final Payment is due on completion of the apartment.